Tietze Management B.V.

Charles Tietze

Interim operations and transformation director.

Netherlands and Belgium; Germany where the working language is English or German.

For mid-sized companies — family-owned and private-equity portfolio — that need to recover in the numbers. Asset-intensive: grid operators and grid connections, industry, logistics. I take over the operation and the cost base, with line authority over people and a P&L. Afterwards it should be possible to say I ran it, not that I advised on it.

How it works

Two weeks, thirty to forty conversations.
From supervisor level up, hunting for the three constraints worth acting on. What people say is triangulated against what the systems show; the gap between the two is where the real problems live.
Every finding gets a number.
Before it reaches the board. "Quite often" is not a finding; a frequency times a cost is.
Every finding leaves with a named owner and a committed date.
Agreed with them first. The first ten presented are the cheap, fast, provable ones — they buy the trust with which the hard ones are accepted without a fight.

What it rests on

A Dutch TSO and a Belgian water utility
Multi-year transformation delivery in utilities; workstream level, commercial and delivery accountability.
BMW Group
Mandated to build a new analytics capability on SAP data from nothing: recruited the statisticians and machine-learning specialists, carried the personal risk of standing it up, and ran every proof of concept through to a working function. Later formalised and aligned with Munich under a German manager; it has since grown into multiple teams and is still running today. Key role in the direct-to-consumer implementation in South Africa, pilot market for a model since rolled out to 60+ markets.
Chairman, organisation of 30+ staff
From structural loss to a €300k surplus in one year, €1.2m reserve at handover, which has continued to grow under successive boards; steered through COVID with salary renegotiations, layoffs and creditors at the table.
BHP Billiton, four manganese mines
Every system, process, data flow and decision-maker mapped; c. R200m of systems overspend exposed. Where the method started, in 2011, and in use since.
Cover
Professional liability €2.5m per claim and per contract year, including €1.25m directors’ liability for interim management. In force from 1 October 2026.